ECC & HERS Rater Testing


Free ECC & HERS Rater Testing Quote
Request Free Pricing Today for your ECC & HERS Rater Testing Project!
Real Prices. Real Fast.
Straight forward pricing, and fast free quotes.
Big Savings
We offer generous savings if multiple services are performed.
High Quality
Detail oriented tests and efficient Title 24 designs.
Licensed and Insured
Licensed, certified, and insured.
ECC and HERS Testing for Sacramento Projects
Poppy Energy coordinates residential ECC rater testing in Sacramento for new homes, ADUs, additions, and qualifying HVAC replacements. In California permit work, Energy Code Compliance (ECC) field verification confirms that installed measures match the project's approved energy documents. Many project teams still use the familiar term HERS testing, so we use ECC/HERS language to make scheduling and closeout easier.
California ECC verification is different from a national RESNET HERS Index, which scores a home's overall energy performance. It is also different from nonresidential acceptance testing. If you need an energy model or compliance report before field work begins, start with our Title 24 report service; the approved report identifies which field verifications apply.
When Is ECC Verification Required?
Requirements depend on the project scope, climate zone, approved compliance documents, equipment, and permit conditions. New residential construction, ADUs, additions, and some HVAC alterations may list one or more field verifications. ECC testing is not automatically the same for every project.
Send us the approved energy report or required-verification forms and the permit scope. We will review the listed measures, identify the appropriate inspection sequence, and flag questions that should go back to the energy consultant, designer, contractor, or building department.
Field Verifications We Coordinate
A project may call for one or several services:
- Duct testing measures leakage from the HVAC duct system.
- Quality Insulation Inspection (QII) checks insulation installation and air-sealing details at the required construction stages.
- Blower door testing measures whole-building air leakage.
- Refrigerant charge verification checks qualifying cooling-system installations when specified.
- Fan efficacy testing verifies fan watt draw and related airflow measurements when specified.
- Title 24 compliance reporting provides the California energy model and documents that establish the project's compliance approach.
These are separate verifications with different readiness conditions. We group appointments when the construction sequence and required tests allow it, but do not assume every measure applies to every permit.
How the Permit-Closeout Process Works
- Project review: We review the approved compliance documents, permit scope, address, and construction schedule.
- Inspection planning: We map each required verification to the appropriate phase, such as pre-drywall QII or completed-system HVAC testing.
- Site verification: The rater completes the applicable measurements and records the project and equipment details.
- Corrections, if needed: The responsible trade corrects incomplete work or a failed measure, and reinspection is arranged when required.
- Documentation: Passing results are completed through the applicable California compliance process for use in permit closeout.
Field verification does not replace plan preparation, energy modeling, installation work, or the building department's final approval. Keeping those roles clear helps prevent scheduling the wrong service or arriving before the site is ready.
What to Send Before Scheduling
Please send the project address, permit number if available, approved Title 24 energy report and required-verification pages, current plans, project type, HVAC equipment information when relevant, and the name and contact information for the site lead. Include the construction stage and a few scheduling windows.
For QII, tell us whether framing, air sealing, and insulation are visible. For HVAC testing, confirm that the system is installed, powered, accessible, and ready to operate. Complete information lets us review the scope before assigning an inspection.
Why Us
Certifications
We are fully licensed and insured, carrying general liability insurance to safeguard you and your home during our work.
Certified ECC HERS Testing by CHEERS
Liability Insurance that covers our work and your home over $2 million
Secretary of State Licensed Business
Happy Customers
ECC/HERS Testing FAQs
Is California ECC testing the same as a RESNET HERS Index?
No. California ECC field verification documents measures required by the state's energy-code compliance process. A national RESNET HERS Index is a separate whole-home rating product.
Does every Sacramento project require every ECC/HERS test?
No. The approved energy documents and permit scope determine which verifications apply. We review those documents before confirming services.
Can one visit cover all required inspections?
Sometimes, but construction stages control timing. QII generally requires visible insulation before wall finishes, while HVAC measurements require completed and operable systems.
Do you provide nonresidential acceptance testing?
Residential ECC/HERS verification and nonresidential acceptance testing are distinct scopes. Send the project documents for a scope review before scheduling.
What happens when a measure does not pass?
We explain the recorded issue so the responsible contractor can make corrections. A follow-up verification may be needed before documentation can be completed.
Ready to clarify your scope? Request a project review or inspection and include the approved energy documents so our team can identify the next step.









Request an ECC/HERS Project Review
Send your permit scope and approved energy documents so we can identify required field verifications and plan the right inspection sequence.


































